|
|
[Machinery] | [Quarries] | [Projects] | [Fairs]
Following are big or prestigious projects we have supplied directly to the main contractors :
- Bank Misr Cairo: supplying 10,000 m2 of Red Aswan granite cut to sizes.
- Semiramis Intercontinental Hotel Cairo: supplying 5,000 m2 of Red Aswan granite cut to sizes.see pictures
- Cairo Metro Line No 1:supplying Red Aswan polished slabs for the whole project.
- Hotel Savoy Milano Italy: supplying 4,000 m2 of Red Aswan granite slabs.
- Menahouse Oberoi Hotel Celebration Hall: 4,000 m2 Carrara marble.
- Movenpick Sharm El Sheikh: supplying 12,000 m2 of Filetto Hassana marble slabs and cut to sizes.
- Maadi Grand Mall supplying 11,000 m2 of various Egyptian granite slabs.
- Paradisio Hotel Hurghada: supplying 4,000 m2 of marble cut to sizes.
- Bank Lumi Israel: supplying 11,000 m2 of Rosa Aswan granite slabs.
- Movenpick Hurghada: supplying 18,000 m2 of marble slabs and cut to sizes.
- Intercontinental Sharm El Sheikh: supplying about 12,000 m2 of marble and granite cut to sizes.
- El Obour Shopping Mall : supplying 6,000 m2 of Rosa Aswan granite slabs.
- Three Stations of Cairo Underground Metro (Mobarak, Massara, Rod El Farag): supplying 10,000 m2 of granite cut to sizes.
-Three Stations of Cairo Underground Metro (Ataba, Sadat, El Awkaf) : supplying 12,000 m2 of granite cut to sizes . (1996)
- Hotel Ritz Carlton Sharm El Sheikh: about 20,000 m2 granite. (1997 - 1999)
- Hotel Hilton Dahab: about 3,000 m2. (1997 - 1998)
- Conrad Hotel: about 30,000 m2 of marble & granite. (1997 - 1998) see pictures
- Hotel Iberhotel Makari Beach: about 5,000 m2 of marble. (1998)
- Two stations of Cairo Underground Metro (Dokki, Behouth ) . (1998)
- Air Force Celebration Hall: 6,000 m2 imported Marble & Granite. (1999) see pictures
- Two stations of Cairo Underground : Giza Suburban, Giza Square: 15,000 m2 of Granite. (1999)
- Le Royal Meridien Cairo - 870 Rooms: about 20,000 m2 of Marble & Granite.(1999-2000) see pictures
- Bukhater Building Sharjah – Dubai : about 16,000m2 of granite.(2000) see pictures
- Four Seasons Hotel–Sharm El Sheikh: about 60,000 m2 of marble & granite.(2000-2001).
- Mariott Mirage Hotel - Cairo: about 15,000 m2 of marble. (2000-2001) (under construction)
- Hilton Kuwait : about 12,000 m2 of marble. (2000-2001) (under construction)
- Pyramid Heights : about 30,000 m2 of granite cladding,10,000 m2 of granite flooring. (2001) (under construction)
- Cascades Hotel, Golf Club House : about 5,000 m2 of marble flooring. (2001) (under construction)
- General Military Headquarter, Abu Dhabi : about 8,000 m2 of granite slabs. (2001) (under construction)
- Hyatt Regency – Soma Bay :(2001) about 3.500 m2 of marble. (under construction)
Back to Profile Main Page
|
|